water conveyance system from Bossita wells field to quartet at northern region
-
Contract Amount
349,375,934 SAR
-
Client
Ministry Of Environment Water & Agriculture
-
Consultant
Al Yarda Consulting
-
Project Duration
36 Months
-
Location
Quartet at Northern Region
-
Pipe line length
169Km
-
Pipe diameter
1000mm
-
Wells
12 Wells
-
Wells Capacity
250 m3/day/well
-
Tanks
3 Tanks
-
Tanks Capacity
40,000 m3 (20000m3+10,000 m3+ 10,000 m3)
-
Pumps Capacity
250 m3 /H head 30m.
-
Project Capacity
40,00 m3 Expandable to 85,000 m3 in the future
-
Scope of Work
- Power plants: 4Nos. LV (400V) generates.
- MV Switchgear.
- Step-down and step-up transformers.
- MV & LV cabling.
- 13.8 KV Overhead line.
- LV Switch boards and related single mode fiber optic.
- Cabling station.
- Wells Field and Pumps.