water conveyance system from Bossita wells field to quartet at northern region

  • Contract Amount

    349,375,934 SAR

  • Client

    Ministry Of Environment Water & Agriculture

  • Consultant

    Al Yarda Consulting

  • Project Duration

    36 Months

  • Location

    Quartet at Northern Region

  • Pipe line length

    169Km

  • Pipe diameter

    1000mm

  • Wells

    12 Wells

  • Wells Capacity

    250 m3/day/well

  • Tanks

    3 Tanks

  • Tanks Capacity

    40,000 m3 (20000m3+10,000 m3+ 10,000 m3)

  • Pumps Capacity

    250 m3 /H head 30m.

  • Project Capacity

    40,00 m3 Expandable to 85,000 m3 in the future

  • Scope of Work

    • Power plants: 4Nos. LV (400V) generates.
    • MV Switchgear.
    • Step-down and step-up transformers.
    • MV & LV cabling.
    • 13.8 KV Overhead line.
    • LV Switch boards and related single mode fiber optic.
    • Cabling station.
    • Wells Field and Pumps.